System blackout is an extraordinary event that occurs in the electricity system. Various efforts have been made to operate the system and implement a reliability system to keep the electricity system from experiencing blackout. But the possibility of a blackout still exists. The system blackout incident on Sunday, August 4, 2019 at 500 kV Java Bali is an evaluation and challenge for PLN to be able to maintain system reliability and also find the most effective way to restore the system in a short time when a blackout occurs. There are several things that become priority for recovery, when the Jakarta and Banten systems are in
a blackout condition. The first priority is to secure the supplies to the VVIP location and the next priority is to send voltage to the large power plant so that the plant can be operated immediately. Therefore, optimization is needed in the system recovery procedure so that it is expected to restore the system in the shortest possible time. PLTMG Senayan is a generating unit prepared as a backup supply for the MRT, but at the same time it can also be used for black start to the power plant, in this case the power plant in Priok.

References

.PT.PLN(Persero) UDIKLAT SEMARANG LIVE and Maintenance.2012. Pengenalan Operasi Sistem Tenaga Listrik. Semarang. Hlm. 5.

.Riadi Muchlisin, “Pembangkit Listrik Tenaga Mikrohidro”. (https://www.kajianpustaka.com/2016/10/pe mbangkit-listrik-tenaga-mikro-hidro.html, diakses 11 Juli 2020:17.35 WIB) .

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 8.

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 8.

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 9.

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 10.

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 10.

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 11.

.Damanik J Pansius.2015 “Modul Kuliah E.21Pembangkit Energi Listrik”. Jakarta : Universitas Krisnadwipayana. Hlm. 12.

.Ramadhani Bagus.2018 “Instalasi Pembangkit Listrik Tenaga Surya”. (https://drive.esdm.go.id/wl/?id=A0Ca89EQ B2v3GpMH0KgM2ylJQCb0o2iK, diakses 16 Juli 2020:10.27 WIB)

.Hidayat Dini, “Pembangkit Listrik Tenaga Bayu”. (www.kabar-banten.com/atasi-masalahbyar-pet-di-lebak-selatan-perusahaanprancis-kembangkan-listrik-tenaga-bayu/, diakses 26 Maret 2020:16.30 WIB)

.PT.PLN(Persero) UDIKLAT SEMARANG LIVE and Maintenance.2012. Pengenalan Operasi Sistem Tenaga Listrik. Semarang. hlm. 14.

.PT.PLN(Persero) UDIKLAT SEMARANG LIVE and Maintenance.2012. Pengenalan Operasi Sistem Tenaga Listrik. Semarang. hlm. 16.

.PT.PLN(Persero) UDIKLAT SEMARANG LIVE and Maintenance.2012. Pengenalan Operasi Sistem Tenaga Listrik. Semarang. hlm. 18.

.PT.PLN(Persero) UDIKLAT SEMARANG LIVE and Maintenance.2012. Overview Proteksi Sistem. Semarang. hlm. 19. [16].PT.PLN(Persero) UDIKLAT SEMARANG LIVE and Maintenance.2012. Overview Proteksi Sistem. Semarang. hlm. 3.

Downloads

Published

2021-01-02

How to Cite

Priyono, T. O., & adjie, . R. P. . (2021). ANALISA OPTIMALISASI PLTMG SENAYAN SEBAGAI PENGIRIM TEGANGAN SISTEM PASCA BLACKOUT AGUSTUS 2019. JURNAL ELEKTRO, 9(1), 45–54. Retrieved from https://journal.teknikunkris.ac.id/index.php/elektro/article/view/399